183A | Austin, Texas
183A | Austin, Texas
The 183A project involved the construction of a new $200 million, 4.5-mile divided toll freeway with a positive barrier.
CLIENT: HILL COUNTRY CONSTRUCTORS (GRANITE CONSTRUCTION AND JD ABRAMS CONSTRUCTION)
Transtec provided optimized pavement designs in jointed concrete, reinforced concrete, and continuously reinforced concrete. Transtec’s approach allowed the client to achieve $8 million in savings through optimized design and expedited construction.