DFW International Airport Evaluation | Dallas-Fort Worth, Texas
Transtec developed a testing and evaluation plan that included a pavement condition survey by RS&H, as well as geotechnical testing and HWD.
County Road 366 | Taylor, Texas
The County Road 366 study limits are from FM 397 (Carlos G. Parker Blvd.) to Chandler Road, a distance of approximately 1.4 miles.
Austin-Bergstrom International Airport | Austin, Texas
Transtec was hired by RS&H to perform an evaluation of airfield pavements at Austin-Bergstrom International Airport (ABIA) in Austin, Texas.
183A | Austin, Texas
183A is a $200 million, 4.5 mile conversion of a four lane arterial into a positive barrier divided toll freeway.
Tire-Pavement Noise Evaluation | Belgium
The $1.1 billion design-build project is a 38-mile stretch of a four-lane ring road surrounding Houston, Texas.
The Whitley | Austin, TX
The $1.1 billion design-build project is a 38-mile stretch of a four-lane ring road surrounding Houston, Texas.
Structurally Reinforced Concrete Pavement Evaluation | Mexico
The $1.1 billion design-build project is a 38-mile stretch of a four-lane ring road surrounding Houston, Texas.
Southwest Rapid Transitway (Stage 2) | Winnipeg, Manitoba
The $1.1 billion design-build project is a 38-mile stretch of a four-lane ring road surrounding Houston, Texas.
Southeast Stoney Trail Project (SEST) | Calgary, Canada
The $1.1 billion design-build project is a 38-mile stretch of a four-lane ring road surrounding Houston, Texas.
SH 45/Loop 1 | Austin, Texas
The $1.1 billion design-build project is a 38-mile stretch of a four-lane ring road surrounding Houston, Texas.