Warrington Avenue | Pittsburgh, Pennsylvania

After many years, Warrington Avenue was in such poor condition that a normal repair wouldn’t have been a sufficient fix.
I-90 | Pennsylvania

Transtec designed an alternative rehabilitation option for I-90, saving the district $10 million in initial cost.
County Road 366 | Taylor, Texas

The County Road 366 study limits are from FM 397 (Carlos G. Parker Blvd.) to Chandler Road, a distance of approximately 1.4 miles.
Southeast Stoney Trail Project (SEST) | Calgary, Canada

The $1.1 billion design-build project is a 38-mile stretch of a four-lane ring road surrounding Houston, Texas.
Residential Street Rehabilitation | Mesquite, Texas

The $1.1 billion design-build project is a 38-mile stretch of a four-lane ring road surrounding Houston, Texas.
Presidio Parkway | San Francisco, California

The $1.1 billion design-build project is a 38-mile stretch of a four-lane ring road surrounding Houston, Texas.
Pittsburgh Busway Rehabilitation | Pennsylvania

The $1.1 billion design-build project is a 38-mile stretch of a four-lane ring road surrounding Houston, Texas.
Pavement Surface Characteristics Testing | Norman, Oklahoma

The $1.1 billion design-build project is a 38-mile stretch of a four-lane ring road surrounding Houston, Texas.