This is a $760 million Public-Private Partnership (P3) to expand and complete 25 kilometers of the main ring road highway around Calgary. This segment of SEST includes a six-lane limited access highway and 27 bridges.

CLIENT: Hochtief PPP Solutions and Macquarie Capital Group

Transtec served as the pavement life cycle advisor to Hochtief on their bid for this project. Transtec developed the reports which were then forwarded to the Lenders. All Operation and Maintenance (O&M) strategies for the project were reviewed and confirmed by Transtec before bid submission. Transtec worked closely with the Concessionaire to ensure that all cost saving measures were considered for the concession period.

[button link=”https://www.thetranstecgroup.com/pavement-engineering-for-design-build-and-p3/” size=”small” style=”light”]Learn more about our DB/P3 services →[/button]