183A is a $200 million, 4.5 mile conversion of a four lane arterial into a positive barrier divided toll freeway.

CLIENT: Hill Country Constructors (Granite Construction and JD Abrams Construction)

Transtec provided optimized pavement designs in jointed concrete, reinforced concrete, and continuously reinforced concrete. Transtec’s approach allowed the client to achieve $8 million in savings through optimized design and expedited construction.